Contact Information
Taiping Cableway Branch of Huangshan Tourism Development Co.,Ltd.

The Taiping Cableway, completed and put into operation in November 1997, is a double-bearing single-traction three-line reversible passenger cableway, with the cable cars accommodating 101 people and the main equipment imported from Austria Waagner Biro.
- 0?openViewGroup(1,0):null)">

-
Full length
3709 (meter) -
Altitude difference of the cableway
1014 ( meter) -
Cableway supports
6 (No.) -
Running speed
10 ( m/s) -
Passengers per cable car
100+1 ( person) -
One-way traffic volume
600 (person/hour)
-
In December 1997, the National Safety Supervision and Inspection Center for Suspended Passenger Cableway and spoke highly of it in the safety inspection and tanked it the first of China then in dip length, cable car capacity, altitude difference, horizontal single span and running speed